What a feasibility study tells you

Before you buy a plot or a ruin: what you can build, what it will roughly cost, and how long permits take.

A feasibility study is two to three weeks of work before you commit to a site. We read the planning rules, walk the land, and sketch what could realistically be built there.

You get three things: how much floor area the rules allow, a rough budget range for building it, and an honest estimate of how long the permit will take.

Most of the clients who commission one either buy with confidence or walk away from a plot that would have cost them two years.

A white card model of a house with sloping columns, lit on a dark table

(08) Start a project

Have a site, a house or a room

in mind?

Send us an address and a rough budget. We reply within two working days, and the first hour is on us.

Studio

Rua da Rosa, Bairro Alto, Lisbon

Visits

Mon – Fri, by appointment

Site notes

Four letters a year: a finished house, a drawing we liked, what we learned on site.

Studio

Rua da Rosa

Bairro Alto, Lisbon

© 2026 Vellum

Architecture & interiors since 2011

Vellum

Create a free website with Framer, the website builder loved by startups, designers and agencies.